Articles & News

Midwest Engineered Systems Expands with a New Building Purchase

Midwest Engineered Systems Inc. (MWES) is thrilled to announce that it has recently acquired a new building located in Waukesha, WI. The new 98,000 sq. ft. building doubles our overall capacity which will meet our customer’s needs. The building will be utilized for our growing robot welding and web handling divisions. Additionally, the new building will allow us to continue to provide large custom assemblies as well as more office space for our growing team.

Along with 19-foot high ceilings in the main bay, the new facility is equipped with 11 large cranes and 3 docks. This capacity allows us to serve the automation needs of all industries.

405 Commerce Street, Waukesha, WI 53186

For over 30 years, Midwest Engineered Systems has been a trusted integrator for specialized industrial automation, assembly automation, material handling, customer service and much more. Our goal is to produce an end product that facilitates our customer’s manufacturing process that enhances their business. 

If your current process is not keeping up with throughput, then contact us today! We can bring your application to the next level.

Share This Article

LinkedIn
Facebook
X/Twitter
Pinterest
Reddit
Email

Contact us today to learn more about how MWES can improve your manufacturing with robotic automation!

Keep informed with the

Latest Updates from MWES

FABTECH 2024 Follow Up

Thank you to everyone who stopped by our robot welding solutions booth at this year’s FABTECH in Orlando! The trade show attracted